2025Beja, Portugal

Beringel – Beja Route

Construction of the Beringel–Beja Bypass, part of the IP8, featuring two lanes in each direction, grade-separated crossings and connections to the existing road network. The project is mainly developed along the corridor previously planned for the A26, between Grândola Sul (A2) and Beja, and is part of the Recovery and Resilience Plan (PRR), within the scope of road accessibility improvements.

Ongoing
Beja
Beja
Beja
Beja
Beja
Beja
Beja
Beja